Project: Central Valley C.S.D. - Jarvis Middle School
Location: Mohawk, New York
Equipment Description: Guckian Energy System provided multiple AAON Air Cooled Scroll Water Chillers for the Central Valley Central School Districts, Jarvis Middle School Project.
The chillers include the following:
Nominal Capacity: 140 Tons ea.
Bitzer Variable Speed Compressor on Lead Stage, On/Off on others
Dual Circuit Refrigeration System
Oversized Brazed Plate Heat Exchanger
Air Cooled Microchannel Condenser With 0 Degree Head Pressure Control
VFD Condenser Fans
Non-Fused Disconnect Switch
Phase & Brownout Protection
Compressor Isolation Valves, Sight Glass
Condenser Coil Guards
Electric Heater in Cabinet
115V Factory Wired & Powered Convenience Outlet
Acoustic Enclosure, Double walled unit construction with R-13 Foam Panel Composite Construction & Thermal Break
Polyurethane paint that passes 2,500 Hr. salt spray test
Hinged access doors with stainless steel hinges and quarter turn latches
Lockable Handles
2” Spring Isolators Mounted on Steel Dunnage
MCS Magnum Controller with Integrated BACnet IP
5 Year Compressor Parts & Labor Warranty